Image specifications:

  • Resolution: 710×473
  • Filesize: 137.96 KB
  • Added by: Wheels&Tracks , 3 years ago
  • Picture status: Accepted

All images have their owners.

If you think that the users of the site made a mistake by posting this image in this section, it would be nice if you wrote about it in the comments and pointed out the error.

Discuss anything and just talk about cars and not only can you on the forum.

Comments

3 years ago
Wheels&Tracks

03/07/2014

The transport of a fully-assembled Liebherr R 996 B hydraulic mining excavator between two mine sites proved to be the largest complete excavator moved in Australian history. Six Prime mover trucks were required to tow and push this 675-tonne (744-short ton) machine from the Fortescue Metals Group (FMG)-owned Christmas Creek mine site to its Solomon mine site. Fortescue contracted Mammoet Australia for this undertaking, and 20 Mammoet employees were required to load the machine onto 24 twin-axle (384 wheels) Goldholfer platforms and move it to its new work site. Travelling up to 12 hours per day at 4 km/h (2.5 mph), it took a total of six days to move the R 996 B the 230 km (142 miles) to the Solomon mine. This newly-commissioned excavator will join thirteen other Liebherr mining machines at work at the Solomon mine site.

https://www.liebherr.com

3 years ago
Алекс

Ого, здоровенный какой исполин

To be able to post a comment, you must create an account or sign in using social networks account

WheelsAge.org '2005–pr.